Yay!! We got new floors. It took a little over 2 days. The living room had to be leveled, so they had to do half the room on the second day and half on the 3rd day.
Ripping up the living room carpet.
Carpet pulled in the dining room.
Hard wood floors under the carpet upstairs.
Stuff all piled in a corner.
Little scooter thing for the guy to kneel on.
Stuff shoved aside in the living room.
The seam between the tiles and the wood in the living room.
The first tile to go down!
Playroom..
The ugly tiles in the living room.
Dining room..
Yucky muddy stuff..
Ewww. Dried light gray over night.
Floors are done, still had to to the 1/4 round. We had a "picnic" on the floor for dinner.
Goofy kids.
Scary face.
Cutie boy feeling a little better. At least I got a smile!
Playing in the evening.
Day 2 in the living room.
Kailyn checking out what's going on.
Day 2. All done upstairs!!
Day 3 all done in the living room!
0 comments:
Post a Comment